The aim is to make earth filling and excavating counterpoise,however,they are always not counterpoise.
为了改进对上述计算方法的不足,本文在综合考虑场地的自然地形、生产运输的技术条件和场地设计坡度要求等诸多因素的基础上,建立一种较为完善的数学模型,使得所计算平土标高,既满足填挖方平衡又使填方量和挖方量总和最小。
balanced earthworks
填挖平衡的土方工程
To reduce earthwork costs, the volume of the fills should be equal to the volume of the cuts.
为了降低土方工程的费用,填方量应等于挖方量。
On Earthwork Balance in Hydraulic Engineering
谈谈水利工程中关于土方平衡的几点体会
ESTIMATION OF CUT-FILL VOLUMES IN ROCK SLOPE ENGINEERINGBASED ON FRACTAL INTERPOLATION
基于分形插值的岩石边坡工程挖填方量估算
This project involved 400000 cubic metres of earthwork.
这项工程要挖40万土方。
Discussion about Shallow Burying Underground Excavation Method Selection in Plain Filling Soil
重庆地铁素填土中浅埋暗挖施工方案比选
Large-diameter longhole blasting was used to excavate soil-rock in some engineering project.
某工程的土石方开挖采用大直径深孔爆破方式。
Research on the Quantity Calculation and Balance Allocation Planning of the Earth-rock Work in Hydropower Project;
水电工程土石方工程量电算及平衡调配规划研究
On Application of Non-equilibrium Thermodynamics in Environmental Geotechnical Project;
非平衡态热力学在环境岩土工程中的应用
Finite Element Analysis of Geocell Dealing with Half-Filled and Half-Dug Road;
土工格室处治半填半挖路基的有限元分析
Wherever possible, the amount in a cut where earth is being removed should be equal to the amount needed for a nearby fill.
只要有可能,挖方的土方和附近填方所需的土方是相等的。
Calculation Method of Earthwork Volume in Project of Waste Landfill Sites
垃圾填埋场工程土方工程量计算方法探讨
Excavation and embankment of earth.
土木工程土地的挖掘和筑根
The Research of Remote Fault Diagnosis Based on Imbalanced Data Mining;
基于不平衡数据挖掘的远程故障诊断研究
The Project involves trench excavation, construction of cable trough, cable laying, backfilling and reinstatement works and landscaping works.
工程包括坑道挖掘、兴建混凝土电缆槽、电缆铺设、回填和修复工程、和景观美化工程。
Soil Plasticizing Technique for EPB Shield Excavation
土压平衡盾构施工中土的塑流化技术
Study on the Calculation of Earth Pressure on Retaining Structure in Excavated Volume Engineering
挖方工程挡土结构土压力计算问题研究
A laborer, especially one employed in construction or excavation projects.
挖土工壮工,尤指被雇干建筑业或掘土工程的人