This paper analyzes the contradictions between waterproof closure and structural integrity, discusses the key problems that should be solved to satisfy the requirements of waterproofing closure, and advances some measures for and principles of the waterproofing work s on the grouting pile head and basement foundation slab.
分析了"防水封闭性"和"结构整体性"的矛盾,论述了满足"防水封闭性"需解决的关键问题,提出了灌注桩桩头与底板连接部位防水措施及防水需遵循的原则。
Prestressed concrete reaction system for ultrahigh static loading tests of bored piles;
超高吨位灌注桩静载试验中的预应力混凝土反力装置
Study on load transfer mechanism of bored piles;
钻孔灌注桩荷载传递机理试验研究
The design and construction method on improving the single pile bearing capacity of the bored pile in pile foundation project;
提高钻孔灌注桩单桩承载力的设计和施工方法
Specification for cast-in-place piles
灌注桩基础技术规程
Research on Side Resistance of Cast-in-place Piles in Field Test
地表试验条件下灌注桩桩侧阻力分析
The application of combination of cast-in-place bored piles and deep-layered agitating pile
钻孔灌注桩和深层搅拌桩组合的应用
The Application of Extruded-expanded Mud-jacking Technique on the Bottom of the Filling Pile
灌注桩桩底挤扩压浆处理工艺及应用
Application of Piling Technology for Expanded Branches and Plates Cast-in place Pile
挤扩支盘灌注桩成桩技术及工程应用
TECHNOLOGY OF PRESSURE GROUTING UNDER PILE TIP AT COBBLE LAYER
桩端压力灌浆工艺在卵石层灌注桩中的应用
The Technique of Pressure Grouting under Piles Tip and Applying to Cast-in-Situ Piles in Gravel;
卵石层中的灌注桩桩端压力灌浆技术及应用
The application and analysis of pressure grouting technique on filling pile bottom in engineering
灌注桩桩底压力灌浆在工程中的应用及分析
Study on the Effect of Integrity of Bored Pile on Bearing Capacity of Pile Foundation;
钻孔灌注桩桩基完整性对桩承载力的影响研究
Research on Construction Technique and Working Mechanism of Bored Pile by Base Post-Grouting;
钻孔灌注桩桩桩端后压浆工艺与机理研究
The Dynamical Examination and Judgement of Perfusion Stake Base with Jamming Slurry on Stake End;
桩端后压浆灌注桩桩基动力的检测与评定
Post Grouting for Hand Dug Piles with the Pipe Driven at the Pile End
人工挖孔灌注桩桩底打管后注浆技术及应用
Latter Cenent-inject Technique Reseach and Application for Underlying of a Big Diameter Drill-affusing Pile in Nerilic Pool Region;
滩涂区钻孔灌注桩桩底注浆技术的研究和应用
Renovation of Cast-in Place Concrete Pile by Compacted Grouting Technology
压密注浆修复混凝土灌注桩桩身缺陷施工技术
The Use of Post-grouting Technique at the Tip of Bored Cast-in-situ Pile
钻孔灌注桩桩端后注浆施工技术的应用
Bored Pile after Pile Grouting Technology and Construction Quality Control
钻孔灌注桩桩底后注浆技术及施工质量控制
Impact of Post Grouting Process of Pile Bottom on Bored Pile Bearing Behavior
桩端后注浆工艺对钻孔灌注桩承载性状的影响
Construction of 90 m Super Deep Bored Pile and Post-Grouting of Bottom Pile
90m超深钻孔灌注桩及其桩端后注浆的施工