From pile allocation,excavation,fabrication of steel reinforcement cage and other aspects the application of man-bored cast-in place pile in deep excavation support is discussed.
以山西铝厂为例,介绍了支护方法的选择及其施工工艺流程,着重从桩孔定位及支护、挖孔方法、钢筋笼的制作与吊装就位等方面阐述了基坑支护的技术措施,指出了施工中应注意的问题,以供类似工程参考借鉴。
Total Station Piling Positioning System and Model Error Analysis;
全站仪打桩定位系统及模型误差分析
Application of GPS-RTK Positioning System for Piling
GPS-RTK打桩定位系统在施工中的应用
Data Processing and Precision Analysis in RTK Positioning for Offshore Piling;
RTK海上打桩定位的数据处理与精度分析
The sea work engineering GPS long-distance the piling fixed position system converts
海工工程GPS远距离打桩定位坐标系统的换算
Calculation for Spud-lifting Force of Cutter Suction Dredger
绞吸式挖泥船定位桩拔桩力计算方法
Seat the post into the canal gently and maintain firm pressure once the post is seated.
轻轻的使桩在根管内就位,一旦桩就位,应保持压力使之牢固稳定。
Design of the optimum plate position and the distance between two Adjacent plates of rotated plate piles
旋扩珠盘桩最优盘位和盘间距的确定
They have pegged the building plot out.
他们已用木桩标出了建筑定位地域的界限。
Design and Study of Cutter Suction Dredger's Spud-Carriage System
绞吸式挖泥船定位桩台车系统设计和研究
Positioning moving reverse equipment design for large screw dredger
浅述大型绞吸船定位移船倒桩装置设计
Location and Installation Technology of Pile and Column Constructed with Reverse Method in Transfer Center of Tianjin Station
天津站轨道换乘中心逆作法桩柱定位安装技术
Long Piles′ Stability Analysis upon Restricted Location by Ritz
Ritz能量法分析约束位置对长桩稳定的影响
The design of spud is the key to design the dredger because of its complexity on load.
定位桩受力复杂、破损率较高,是挖泥船设计好坏的关键.
The Research of Automatic Position Orientation System for the Huge General Stake-Frame;
大型通用桩架桅杆角度自动定位控制系统的研究
Fatigue Analysis of the Spud System of the Cutter Suction Dredger by Wave Load
挖泥船定位桩系统在波浪载荷作用下的疲劳强度分析
The Dynamical Examination and Judgement of Perfusion Stake Base with Jamming Slurry on Stake End;
桩端后压浆灌注桩桩基动力的检测与评定
Simulating rock-socketed pile group stability based on ANSYS
应用ANSYS模拟嵌岩桩桩群稳定性
We anchored the tent with pegs.
我们用桩子固定帐篷。