Calculation of cost claims in construction delay claims;
工程延误费用索赔的计算
Considering the difficulty of allotting responsibility of project delay in multi-event interference,a new analytic method based on Shapley value for the problem is presented in this paper.
在工程项目合同管理中,做好工期延误的责任归属和量化对于监理工程师公平、公正地处理工期索赔,维护业主和承包人的合法权益具有重要意义。
Analysis on the construction period delay and its relative costs under the FIDIC contract conditions;
FIDIC 合同条件下工期延误及相关费用分析
In construction of a international water conservancy project , amount of works increases with variation of natural in-situ conditions , which leads to construction delay and construction cost increase , then economic losses of the Contractor.
在国际水利工程施工中,由于现场自然条件的改变(而非承包商的原因)引起工程量的增加,势必会导致工期延误和施工费用的增加,给承包商造成工期和经济损失。
Application of claim for the cost of construction delays of the international project
国际工程施工延误费用索赔的应用
Dynamic analysis method calculating construction delay time claimed;
动态分析法是近年来提出的计算施工延误工期索赔值的一种方法。
prolongation costs
工程延误引致的额外费用
Factors that conspired to delay the project.
凑在一起造成工程延误的因素
The Study on the Cause of Delay & the Model of Early Warning in Construction Project;
工程项目工期延误原因及预警模型研究
Analysis on Articles about Construction Period Delay and Compensation in Engineering Con-struction Contract;
工程建设合同工期延误与赔偿费条款分析
Expense Claim for Construction Delay of International Water Conservancy Project;
关于国际水利工程工期延误的费用索赔浅析
The Progress Delay Factors Analysis and Corresponding Measures of Thermal Power Plant Ash Yard Project
火电厂灰场工程进度延误因素分析及对策研究
Failure to start construction as scheduled or delay of completion caused by serious natural disaster.
一、遭逢天然重大灾害,致无法如期开工或延误完工时程者。
4. oLoss of Money / Documents 5. oTravel Delay / Re-routing 6. oBaggage Delay/Emergency Purchase
金钱/证件遗失行程延误/更改行李延误/紧急购物
delay allowance
延误外加时间;容许延迟;过程空裕;时延容许量
Failure to start construction as scheduled or delay of completion caused by occurrence of war or great social, or economic incidence.
二、遭逢战争、或社会、经济之重大变故,致无法如期开工或延误完工时程者。
The delay was in part due to the heavy rain.
在某种程度上讲,延误是由大雨造成的。
A Probe into Causes of Delay in the Course of Early Chinese Modernization;
中国早期现代化进程延误的原因探析
This work demands your attention without delay!
这工作急需你去做,不得延误!
Owing to the recent bad weather, the work is several weeks behind schedule.
由于最近天气不好,工作延误了几周。
The strike caused a great delay in the delivery of the mail.
这次罢工严重地延误了邮件的投递。
Research on Influencing Factors of Schedule Delays in Construction Projects;
建设项目中的工期延误影响因素研究
A Study on Responsibility of Project Delay Based on Shapley Value;
基于Shapley值的工期延误分析
STUDY ON THE PRINCIPLE OF DELAY CLAIMS WITH MULTI-EVENT INTERFERENCE;
多事件干扰下工期延误索赔原则研究