The Allocation Model of Fire Resource Based on Multistage Fire Protection Process;
基于多阶段灭火过程的消防资源布局模型
For a class of networked control systems(NCS) with equality constraint,this paper addresses the problem of designing controller,sampling period and the maximum allowable delay bound(MADB).
针对一类具有等式约束的网络控制系统控制器、采样周期以及最大允许延迟时间的设计问题,采用李亚普诺夫函数、线性矩阵不等式的方法,推导出了该网络控制系统渐近稳定的充分条件。
According to maximum acceptable start time at the temperature same as engine testing,a method for determining turboshaft engine minimum required torque for starting was put forward and it is proved by test that the calculated result is in accordance with the test data.
按照发动机在此温度条件下的最大允许起动时间,提出了确定发动机在该大气温度条件下起动时最小所需扭矩的方法,并通过试验表明用这种方法得到的计算结果和试验结果较吻合。
elapsed time standard
灭火各阶段最多允许时间标准
Research on Each Section Speed Optimum Time Control Standard of Man s 400 m Running;
男子400m跑各分段速度最佳化时控区间标准研究
pre-engineered suppression system
预制标准间的灭火系统
Multi-period portfolio optimization when exit time is uncertain;
不确定终止时间的多阶段最优投资组合
The time specified is greater than the maximum point in time allowed. Time corrected.
指定的时间大于允许的最大时间点。已更正时间。
The time specified is less than the minimum point in time allowed. Time corrected.
指定的时间小于允许的最小时间点。已更正时间。
Packet encryption also allows packets to be time-stamped.
包加密也允许包被加上时间标记。
permissible discharge of standard cell
标准电池允许放电量
Many packets can be sent as time allows.
只要时间允许多个包可以发送出去。
project timetable and projected activities in phases
项目时间表及各阶段活动
standard spray sprinkler system
标准自动喷水灭火系统
They were allowed two days for making the necessary preparation.
为了做必要的准备允许他们两天的时间。
Setting of Optimum Delay Time for Flameout Protection of Power Plant Boilers
电站锅炉最佳灭火保护动作延时时间的探讨
According to the ancient Brahmans, when a fire was extinguished it went into a state of latency.
根据古老的婆罗门信仰,火焰熄灭时进入一个潜在阶段。
Other standards must be issued in stages, with the final deadline being in the year 2000.
其他标准分阶段颁布,最后的限期是2000年。
Maximum allowed time for Active session in milliseconds where 0 implies NEVER.
活动会话所允许的最长时间(毫秒),0 表示“从不”。
The value entered exceeds the maximum allowed value for work hours per day.
输入的值超出每天工作时间所允许的最大值。
Allow us a higher rate for a certain period, say six months.
允许我们在某一段时间,比如六个月时间内拥有较高佣金率,