The prestressed concrete techniqres ie using steel cable and huge jack are applied in the erection of inverted taper shaped water tower and cistern at 30m above the horigone.
运用预应力张拉施工工艺原理,用钢绞线和大吨位千斤顶将混凝土水塔水箱从地面提升到30m高处就位。
Forming process and die design for the bracket for water tank;
水箱支架成形工艺与模具设计
The practical blasting demolition of a 30-meter-high reinforced concrete frame water tower was introduced.
介绍了爆破拆除30 m高钢筋混凝土框架式水塔工程实例。