Design on Foundations of Elipse Vibro-screens;
椭圆振动筛基础设计及动力分析
Treatment on Asphalt Sand Pad Layer Cracking and Flatness out of Specification Value in Storage Tank Foundation and Precaution;
储罐基础沥青砂垫层裂纹和凹凸度超标的处理及预防
Calculation of Annular Foundation Force of Large Storage Tank and Compiling of General Drawing;
大型储罐基础环向力计算及通用图编制
Sinkage of Compressor Base and Its Solving;
增压机基础下沉原因分析与处理
The Calculating Method of the Tilted Installation Angle Iron for Tower Base;
高低腿角钢斜插式基础技术数据的计算方法
Mass concrete construction of base of 1080m~3 blast furnace;
1080m~3高炉基础大体积混凝土施工
Design Scheme of OU Depot Basis on the Soft Base and Its Analysis;
海软土地区石油库基础设计方案及分析
To speed up continuing medical education (CME) to settle a basis for medical improvement;
加快推进继续医学教育工作 为卫生事业发展奠定基础
The quality control of built-in foundation bolt of the basis of hollow non-conventional type equipment;
中空异型设备基础预埋地脚螺栓质量控制
Teaching reform research of mechanical design basic course suitable for water and power trade;
适应水电行业的《机械设计基础》教学改革研究
Application of drilling concrete pile in the basic construction of great bridge s primary-pier;
嵌岩灌注桩在大桥主墩基础施工中的应用
Analysis of the Basic and Foreground about Travel Cooperation in the Five Central ProvincesCommercial college jianghan University Wuhan.;
中部五省区域旅游合作基础与前景分析
Because a building are added from one storey to four storeies,the basement needs to be strengthened and the main structure meets the design demand after checking computations.
采用天然基础的某综合楼因使用需要由原来 1层增至 4层 ,主体结构经验算达到设计要求 ,基础需要加固 ,采用锚杆静压桩进行处理 ,取得较为理想的加固效果。
The GIS basement of Wanjiazai YRDP main stream three grade pump station adopt cast in sith.
万家寨引黄工程总干三级泵站GIS室基础采用现浇砼灌注桩施工 ,砼灌注桩施工设备简单、方便 ,浇筑速度快 ,整体性好。
In view of the possibity of cracks in construction of large volume concrete basement, some measures against the cracks in practical examples are discussed.
针对大体积砼基础施工中容易产生裂缝的问题,本文结合具体实例论述了避免产生裂缝的施工措施。