This paper presents a constrained energy minimization method of sub-pixel target detection for hyper-spectral imageries based on minimum noise fraction (MNF-CEM).
提出了一种基于最小噪声分离的约束能量最小化亚像元目标探测方法。
An efficient algorithm based on the constrained chemical potential minimization method is proposed for computing these diagrams.
根据国内外的优势区相图计算机研究状况,作者采用化学势最小约束原理开发了一种新算法,并给出了新算法的程序框图和应用实例。
A Constrained Energy Minimization Method in Sub-pixel Target Detection Based on Minimization Noise Fraction
基于最小噪声分离的约束能量最小化亚像元目标探测方法
LP Minimizing Sequence on Constrained Optimization Problems;
约束最优化问题中的LP最小值序列
Natural Runoff Stage Analysis Controlled by the Least Duration of Each Stage of the Yellow River
不同最小控制时段约束下黄河天然径流量变化阶段性
Minimization of XML tree pattern queries under DTD constraints
DTD约束下的XML树模式查询最小化
Stationary and Minimizing Sequences of Nonsmooth Constrained Optimization Problems;
非光滑约束最优化的稳定序列和最小值序列
Measurement of short arc based on centre constraint least-square circle fitting
基于圆心约束最小二乘圆拟合的短圆弧测量
constrained GLS
约束广义最小平方法
Optimization of Workflow Time Performance through Optimized Resources Configuration with Cost Constraint;
成本约束下工作流时间最小化的资源配置优化
An Efficient Algorithm for Minimizing Tree Pattern Queries in the Presence of Integrity Constrains
存在完整性约束时最小化树模式查询的算法
An Adaptive Method for Constrained Optimization Least-Squares Problems;
约束优化最小二乘问题的一种适用的方法
Minimization of Pattern Tree Queries under Stuctural Constraints for XML
基于XML结构性约束的模式树查询最小化
Minimization of Path Expression Under Structural Integrity Constraints for XML
XML结构完整性约束下的路径表达式的最小化
Project scheduling for minimizing financing cost under deadline constraint
截止日期约束下的融资费用最小化项目调度
An Algorithm for the Minimum Cost Max-flow with Limited Flow Between Two Notes in the Traffic and Transportation Network
交通运输网络中两个结点间有流量约束的最小费用最大流算法
SUMT (Sequential Unconstrained Minimization Technique)
顺序无约束极小化技术
sequential unconstrained minimization technique
序贯无约束极小化方法
minimum and maximum amount
最小与最大约定数量
Optimization methods for disassembly scheduling problems with capacity constrains in remanufacturing system
再制造系统能力约束下拆卸批量计划优化方法