Saving cost of CAPEX projects monitor and report these saving.
节省成本的CAPEX跟踪和节省汇报.
互联网
Assist Engineering Manager to prepare the annual operation budgets for capex projects.
协助工程经理准备工厂资本项目的年度预算.
互联网
Participate in drawing up annual plan of capex projects of the Plant.
参与制定工厂资本项目的年度规划.
互联网
Capex savings by improving the trunking efficiency in case of temporary congestion.
资本支出的节省,通过提高集群的效率,案件的临时交通挤塞问题.
互联网
Assist Engineering Manager for defining annual capex projects.
协助工程经理确定工厂年度资本项目的构成.
互联网
The Capex & Productivity ( CP ) is responsible for plant - wide productivity programs and driving cost saving.
生产力控制工程师负责生产力项目和推动节省成本.
互联网
To involve the special project analysis including CapEx investment ROI, costing and margin analysis.
参与重大投资项目的分析,包括投资回报分析, 成本预测和毛利分析等.
互联网
It is well known that profits lead capex spending by about a year.
众所周知,利润引导资本支出已经一年了.
互联网