Discusses the significance of controlling project investment in design stage,probes into the application of some methods such as quota design and value engineering in the controlling of project investment in design stage combined with cases.
论述了设计阶段控制投资的重要性,结合案例,探讨了限额设计、价值工程等方法在设计阶段投资控制中的应用。
aggregate limit
(配额的) 总限额
a credit period, agreement, limit
赊欠期限、 协议、 限额.
ceiling and per capita ceiling principles (T and D)
最高限额及人均最高限额两项原则
Commodities Trading (Trading Limits and Position Limits) Rules
《商品交易(交易限额及持仓限额)规则》
compensation ceiling
最高赔偿额,赔偿上限,赔偿限额
compensation limit
赔偿上限,赔偿限额,最高赔偿额
IPF expenditure ceilings
指规数支出最高限额
maximum rent allowance
租金津贴的最高限额
open-end mortgage bond
未列限额的抵押债券
Don't go over the limit of your allowance.
不要超过你的限额。
earned income limitation
勤劳所得减免税限额
Is this within the tax-free limit?
这个在免税限额内吗?
That's more than we can allow you free.
那已经超出了免税限额。
The free allowance for luggage is 20 kilos.
免费行李限额是20 公斤。
What 's the maximum weight allowed ?
最高重量限额是多少?
What's the allowance of luggage?
行李的重量限额是多少?
O. G. L. [Open General License ]
不限额进口许可证[
The free allowance for luggage is 20 kg.
免费行李限额是20公斤。